The horizon and the D-Day beaches threatened by an industrial area
The maritime industrial area will cover 50 km2 and will be spiked with 75 monsters, iron and non recyclable composite made and 150 m in wingspan. They will peak 180 m above sea level. The seabed will be drilled by underpinning stakes. The marine sediments will be occupied by a mess of electrical wires. Each machine will weigh at least 1500 tonnes. No wind turbine of this type and power – 6 MW – has ever proved in real conditions its supporting capacity and productivity.
These outrageous projects of construction of wind turbine parks off Noirmoutier, Saint-Nazaire, Saint-Brieuc, D-Day beaches, Fécamp and Le Tréport are promoted and operated by Alstom, Areva and EDF, the very same players which have imposed the nuclear miracle upon France. Caution is the order of the day.
Inventory of War Remains of Atlantique-Manche Regions from January 1, 2008 to December 31
Inventory of War Remains
Atlantique-Manche Regions
January 1, 2008 – December 31, 2013
Special D-Day Commemoration
June 2014
Sommaire
Introduction
Weapons in the inventory
Sanitary and environmental risk
Inventory of War Remains from January 1, 2008 to December 31, 2013 with maps: